Mendoza
CONTROLS
(904) 862-3575
SERVICES / CONTROLS

PLC Battery Replacement & Program Recovery

Battery replacement that does not take the program with it, plus backup and recovery when one already has. Common battery part numbers for Allen-Bradley, Siemens, Omron, and Mitsubishi processors are stocked, so most jobs finish on the first visit.

Allen-Bradley MicroLogix 1500 processor and I/O rack in an older control cabinet, with the battery compartment at the end of the controller

WHAT WE DO

A dead battery is a small job with a large risk attached, because the program can leave with it. Every PLC battery replacement is scheduled around securing the program first, so the panel is never opened without a verified copy in hand.

The program is read out and confirmed before the battery is removed, checked again once the new cell is in, and the backup file stays with you. Common parts include the 1747-BA and 1756-BA1 for SLC 500 and ControlLogix racks, 1769-BA for CompactLogix, and the battery packs behind MicroLogix 1000 through 1500. On Siemens processors we follow the siemens PLC backup procedure across S7-200 through S7-1500, and Omron, Mitsubishi FX2N, and GE Fanuc VersaMax processors get the same backup-first treatment. Where no backup exists, PLC backup software recovery is attempted before the battery is replaced blind.

BRANDS & PLATFORMS

Allen-Bradley Siemens Omron Mitsubishi FX2N GE Fanuc VersaMax

FREQUENTLY ASKED QUESTIONS

Will I lose my program during a battery replacement? Not when the program is backed up first, which is standard on every PLC battery replacement we perform. Most Allen-Bradley and Siemens processors hold memory briefly after power loss, but a dead battery combined with a power cycle is what actually erases a program.
Which battery part numbers do you carry? 1747-BA and 1756-BA1 for SLC 500 and ControlLogix, 1769-BA for CompactLogix, B9650T and the MicroLogix 1000 to 1500 packs, plus Siemens S7 batteries and Omron and Mitsubishi FX2N equivalents. Call with the processor model if you are not certain which one applies.
What's the Siemens PLC backup procedure before a battery swap? A full backup PLC siemens copy is taken first, covering program, hardware configuration, and parameters, following the same siemens PLC backup procedure whether the processor is an S7-200 or an S7-1500.
What if the battery already died and the program is gone? Program recovery is attempted from any existing PLC backup software file first. Where none exists, the logic is rebuilt from documentation or from the machine's observed sequence. See PLC Programming Services for that work. View that page →
Do you handle Allen-Bradley firmware upgrades at the same time? Yes. Allen bradley firmware upgrade work is common on older processors during a battery visit, particularly where parts support has narrowed to a specific firmware revision.
Is this covered by a maintenance visit or a separate call? Either. Battery checks fit into a scheduled maintenance round, or we dispatch for a single processor showing a low-battery alarm.

RELATED SERVICES

ALL SERVICES →